Industrial
German Creek Washplant Alterations
This project involved the intricate process of measuring the existing washplant and producing a 3D model to reflect this information. From there we had to redesign multiple pipelines through out the plant to allow for future alterations within the plant.
Structural Steel Detail
Full steel detailing of structural steel & Tilt Panels for various projects